Wednesday 22 May 2019

Shot List

Close up - on gear
Pull focus
Panning
Establishing shot - The outside of the studio
Mid shot
 Mid long shot



Tuesday 21 May 2019

Contingency Plan

Lighting:
Take my own lighting rig (small light box) in case the in building lighting isn't good enough to help keep noise of the footage to a minimum.

Weather:
For me this isn't an issue whilst recording as I will be in side, however I will have to check the weather updates so no gear or myself gets wet on the walk up to the studio.

Camera:
Charge the batteries the night before but take a spare with me in case they run out.
Take a spare SD card in case the first one gets full

3D Text Tracking:
If the 3D tracking doesn't go to plan, I can still do the video without it as it was an extra feature I wanted to add rather than a necessity.

Performers:
It'll be easier to shoot without them as it'll be easier to schedule and less paper work and it'll still look good as my original plans didn't performers.

Health and Safety:
Try to be as safe as possible to prevent injuries
if serious injuries do occur, call an ambulance, take them to a safer location and treat the injuries if possible.

Scheduling:
Agree on a time and day with Dave a week in advance and let him know about any changes if they happen to the time or day.

Promotional Videos And Evalutation


Evaluation:
Overall I'm happy with the finished product of my promotional videos for Warehouse 18. 
Although I had to abandon the idea of 3D tracking the text as there wasn't enough room due to the close ups, I feel that the videos still clearly show what it is you're buying in the rehearsal rooms and recording studio. After sending the initial videos to my client for feedback, he was pleased with them, asked for a longer video showcasing all of the rooms and said he is going to use them on his website and social media page (Facebook). Hopefully this will help him gain more bands to use the rooms and recording studio. The lighting in the room made the videos look a little bland and washed out but I managed to fix that with colour correction and levelling in Premiere Pro to give it more of a cinematic feel as well as adding in the letter box bars. 


Friday 12 April 2019

Test Footage



The plan for this test footage is to use 3D tracking to label the equipment in the room letting the audience know exactly what it is they're paying for even if it's not visible clear on screen the 3D tracking will help. 

Editing Evaluation

Video evaluation on editing